logó Kispesti Vass Lajos Általános Iskola
menüMENÜ   
ismétISMÉT   

Angol érettségi - nyelvhelyesség 2017.május/1.

Középszintű angol érettségi 2017. május - 1. nyelvhelyesség feladat.

Írd be a hiányzó szavak betűjelét!



THE CHANNEL TUNNEL

The Channel Tunnel is 31.4 miles long, (0) C it the 11th longest tunnel in (1) . It has the longest undersea portion of any tunnel in the world (23.5 miles). There are actually three tunnels down there - two for trains and a smaller service tunnel (2) can be used in emergencies.

Construction (3) six years (1988-1994). Englishman Graham Fagg and Frenchman Phillippe Cozette (4) out the ceremonial breakthrough on December 1, 1990. They didn't quite meet in the middle – the English side tunnelled the greater distance. Eleven special machines were used to (5) the tunnel. Each of them was as long as two football pitches. One from the British side remains (6) under the

Channel. Another was sold on eBay for £39,999 in 2004. In 2014 a record 21 million passengers were transported between Britain and France (7) the tunnel – up from 7.3 million in 1995, its first full year in operation. A pet travel scheme introduced in 2000 has

(8) more than one million dogs and cats travelling through the tunnel.



A) BURIED
B) BURY
C) MAKING
D) CARRIED
E) DIG
F) DIGGING
G) SEEN
H) THAT
I) TOOK
K) USE
L) USING
M) WHAT


Ahogy a legtöbb honlap, ez a webhely is használ sütiket a weboldalain.